Schools, universities and classrooms delivered in months, not years
Universidad del Rosario added 11,500 m² across its Mutis and Norte campuses in 100 days of site work. Steel framing for permanent buildings and relocatable modular classrooms — dry assembly, phased delivery and compliance with NSR-10 and REP-2021 — for campuses that cannot stop.
- 4 documented education projects in Colombia and Panama — verifiable area, timeline and location.
- Universidad del Rosario: 11,500 m² in 100 days (Mutis and Norte campuses, Bogotá).
- Colegio Bilingüe: 1,100 m² in 8 phases without interrupting classes (Panama City).
- Two systems: steel framing for permanent buildings and relocatable prefabricated modular classrooms.
Building for education without stopping the school year.
Fixed academic calendars, a campus full of students and demanding codes: education construction does not forgive uncertain schedules.
A campus cannot close because there is construction going on. The academic calendar leaves short intervention windows — breaks, inter-semester holidays, weekends — and every week of delay is paid in classrooms that do not open on time. Traditional wet, sequential construction rarely fits those windows: timelines stretch into years and the works share the site with students, noise and debris for far too long.
Industrialized construction reverses that equation. While foundations advance on campus, the structure is fabricated in parallel at the group's CNC plant (NewCon Steel®, Las Mañanitas · EMMA regime) in Zn-Al-Mg 275 g/m² steel with a ±0.5 mm fabrication tolerance. On site there is only assembly: dry works, less noise and up to 30% less construction waste — up to 90% faster than traditional building. That is why an education building in steel framing typically takes 3–5 months from foundations, and prefabricated modular classrooms are deployed in weeks.
Student safety also demands phased works: each zone is isolated and built while the rest of the campus operates normally. That is how the Colegio Bilingüe in Panama City — 1,100 m² executed in 8 phases — was built without interrupting classes. Speed does not exempt compliance: every project is designed to NSR-10 in Colombia and REP-2021 in Panama, with electrical installations under RETIE, inside the ISO 9001 · 14001 · 45001 · 37001 quality system of PEB Corp Group. The full evidence is in the project portfolio.
Six advantages for schools and universities.
What industrialized construction solves on a campus — with evidence from delivered projects.
-
01
Delivery between academic terms
Steel framing buildings in 3–5 months from foundations and modular projects in 60–120 days: works are scheduled so classrooms open at the start of the term, not halfway through it.
-
02
Phases without closing the campus
The structure arrives fabricated and is dry-assembled in stages. Evidence: Colegio Bilingüe in Panama City — 1,100 m² in 8 phases — with classes running throughout.
-
03
Code-compliant learning spaces
Design and calculation to NSR-10 (Colombia) and REP-2021 (Panama), electrical installations to RETIE and profiles per AISI S100 — permit documentation included.
-
04
Classrooms that grow and relocate
Interconnectable modules grow with enrolment: they are extended classroom by classroom, dismantled and relocated to another campus when demand changes.
-
05
Acoustic and thermal comfort by design
Wall build-ups are specified layer by layer in the BIM model, room by room: classrooms, laboratories and libraries with acoustic and thermal insulation defined before fabrication.
-
06
Low maintenance
Zn-Al-Mg 275 g/m² steel profiles and dry assembly: a dimensionally stable, corrosion-resistant structure with low maintenance over the life of the building.
Colegio Santa Luisa · 2,500 m² in 3 months · Bogotá, Colombia
Four education projects, verifiable figures.
Area, timeline and location for each project — every card links to its entry in the portfolio.
Systems, timelines and codes for the sector.
The data an infrastructure director needs to evaluate the industrialized option.
- Systems
- Steel framing (LGS/CFS) for permanent buildings · prefabricated modules for relocatable classrooms
- Timelines
- Modular classrooms in weeks · education buildings in 3–5 months from foundations · complete modular projects in 60–120 days
- Codes
- NSR-10 (Colombia) · REP-2021 (Panama) · RETIE (electrical installations, Colombia) · IBC · AISI S100
- Delivery model
- Turnkey: BIM design and engineering, fabrication, logistics, civil works and installation — one contract
Frequently asked questions about modular schools.
How long does it take to build a modular school?
Can you build while the school is in operation?
Do modular classrooms comply with building codes?
How much does a prefabricated school cost?
Your next education building, ready in months.
Tell us the area, use and location of the project — reply within 24 business hours and technical proposal in 48 h.